Before any piece of Fabco equipment is
moved to the Assembly Department, it is
subjected to a rigorous pre-assembly quality
inspection to assure that every weld is of
the highest quality workmanship. After
passing this process, some equipment will
proceed immediately to the Assembly Shop,
but most items go to the Blasting Room
first. Here, any imperfections in the metal
finish are eliminated by the high pressure
bead blast.
Then the Assembly crew takes over and
begins the process of putting together all
the individual parts that make Fabco
Equipment operate. Among the hundreds of
items meticulously installed by the Fabco
Assembly Department crew are shafts,
sprockets, bearings, conveyor belt and
chain, sensors, diverters and gates, motors
and gearboxes, air and hydraulic cylinders,
and all manner of hardware. Finally, before
release to shipping, each piece of equipment
undergoes a final quality inspection which
includes operation under power to insure the
utmost in quality and operation.

The members of Fabco's Assembly
Department work closely with the
Engineering, Technology and Fabrication
departments to provide our customers the
best quality stainless steel conveyors,
material handling and food processing
equipment available in the industry. |

|